What Are Managed Services?
Energy & Sustainability • Applying green processes and sustainable design for construction and operations practices throughout the building life-cycle • Energy consulting, management and operational practices to improve efficiencies and reduce costs • Designing unique and effective associate engagement and participation programs to encourage sustainability efforts Building Services • Welcoming, safe and productive workplace environments • Managing all building-related service functions and overall associate experience • Managing the entire facility management spend, while optimizing service levels Reporting & Planning • Detailed, customized reporting enables a strategic approach to managing your facilities • Improved financial transparency yields greater cost control and risk mitigation • Short and long term operational and capital planning designed to avoid unforeseen expenditure and preserve asset life Critical Environments • Process-driven approach with a focus on reliability, risk mitigation and safety • Improved system performance and reliability ensuring business continuity • Procedures and detailed change management programs for consistent results and reduced risk of downtime Projects & Workplace • Workplace optimization and associate moves/ adds/ changes • Project management, construction and budgeting • Furniture, fixtures and equipment management and property assets
Roof & Structure
Energy Efficiency
Conference/Audio Visual
Projects & Construction
Repairs & Maintenance
Workplace Optimization
Critical Environments
Moves/Adds/Changes
Furniture & Equipment
Environmental Health & Safety
Facility Administration
Life-Cycle Planning
Cafeteria/Vending
Utilities Management
Reprographics/Mail Room
Sustainability
Waste & Recycling
Grounds Management
Reception/Concierge
Security/Building Access
2 | Cassidy Turley
Driving Solutions Through Facility Services
An Energizing and Efficient Workspace Enabling employees to focus on core business objectives A Strategy that Reduces and Controlls Costs Driving significant operational savings through informed financial management
In Their Words
“Cassidy Turley is an integral part of the Hanesbrands organization, their ability to interface seamlessly and professionally with our diverse business units makes our partnership a suc- cessful case study in outsourcing.” –– Kevin Dollhopf, VP of World Wide Real Estate Hanesbrands Inc.
A Culture that Optimizes Facility Performance Embracing a collaborative approach aligned to our clients’ goals
Managing your facility through innovative solutions that deliver measurable outcomes in the following areas: Facility & Operational Review Technology Solutions Facility Management Service Center Sustainability Services
Vendor & Contract Management
Project Management
• Centralized FM Service Center supports our clients locations across the country and responds to service requests 24/7 • Variable resources to cost effectively manage and service smaller locations and disperse portfolios • Contract and vendor management leveraged across our 455 million SF of managed property, designed to manage service levels, contract terms and operational metrics
• From full LEED certification assistance to basic sustainability programs, tailored solutions to maximize sustainable opportunities for every type of real estate • Purchasing agreements, energy analysis and recommendation for controls and operational changes to reduce costs, utility rates and
• Facility condition assessments and organizational review designed to identify workloads, procedures and increase value and utilization • Technical operations reviews and development of predictive and preventive maintenance programs • Operational, financial and administrative review and development of recommendations designed to improve overall facility and property efficiency, ensure consistent service levels and mitigate risk exposure
• Nationwide project management and design services capabilities, managing more than 4,000 projects each year • Listening to our clients, understanding their project goals and timelines while increasing quality and reducing costs • Delivering an average of 10-25% savings of the project cost on each assignment
• National sourcing team augmented by regional sourcing subject matter experts • Vendor Management System provides tracking of more than 4,000 vendors and suppliers to ensure consistent quality and risk mitigation through contract and insurance management • Leverage the 455 million square feet of managed property to reduce contract and vendor costs by 15%-30% without compromising service delivery
• Technology solutions to meet your specific requirements and custom designed solution, specifically tailored to meet our client’s needs • Dedicated IT Project Management team for implementation and client integration • Technology solutions that provide meaningful data, ease of use and cost effectiveness
alternate energy sources • Specialists in designing
recycling, reduction, awareness and commuting study programs and fostering motivation for success
cassidyturley.com | 3
Work Order Management
Through collaboration and integration with the Client team, Cassidy Turley ensures service satisfaction
Repairs satisfactorily completed? i satisf t ri c l t
Expense approved by x e s rov y t Client
Client
Client
No
Yes
No
Service request submitted
and Cassidy Turley review options, develop
Client
Cassidy Turley Cassidy Turley confirms service completion with Client completion with Client
Lease reviewed to determine maintenance responsibility Lease revie ed t t r i e i ilit
Cassidy Turley requests vendor quotes for repairs
Estimated cost of repair less than $600?
Pricing sent to Pricing sent to Client for approval for approval Client
Whose responsibility is repair?
Client
No
Service request closed in system
Yes
Cassidy Turley S A M P L E Sample Responsibility Matrix r i r uest itt to qualified vendor Cassidy Turley confirms service co pleti it LL / Cassidy Turley c t t L / e r t i Request submitted via online portal? Service request entered into system by Cassidy Turley Cassidy Turley places service call to landlord or PM Landlord No Service request not to exceed $600 Service request submitted to Yes Vendor bid less than $5,000? Service request submitted to 2nd vendor for bid Yes No Cassidy Turley authorizes vendor to provide services Cassidy Turley completion with LLD/vendor Cassidy Turley contacts LLD/ vendor to resolve issue Category Landlord Tenant Lease is Silent Notes Doors X X Par. 13 Par. 13 Electrical Fire/Life Safety X Amend. 1, Par. 7:
Vendor invoice
Coded invoice, and approval sent to
Yes
less than $1,000?
Client
No
CapEX form, coded invoice, and approval sent to Client
Sprinkler System
Floors
X
Par. 13
Cassidy Turley manages all vendors to client-specific service level requirements
Foundation
X
Amend. 1, Par. 7
Glazing
X
Par. 13
Vendor assesses repair and provides price quote
2nd Vendor assesses repair and submits pricing
HVAC
X
Interior Décor
X
Cassidy Turley drives savings through our database of more than 4,200 local and national service providers including:
Vendor
Vendor
Cost of repair less than $600?
Vendor submits pricing for approval
Vendor completes repairs
Vendor completes repairs
No
Yes
Landlord completes repairs
Landlord performs repairs
Landlord
Landlord
4 | Cassidy Turley
Customizing Engineering & Maintenance
Service Delivery Model Cassidy Turley self-performs approximately 80% of its facilities management work.
Engineering Services
Online training for core engineering requirements and in-house training for building specific task and procedures.
1. Team Development
Outsource • Janitorial
Combination • HVAC Maintenance • Recycling Management • Painting • General Electric • Preventative Maintenance • Plumbing • Keys & Locks • Copy Center & Mailroom
• Porter Service • Trash Removal
Best-in-class processes and procedures to ensure reliability, efficiency, and expected life cycles for building equipment and systems.
Self-Perform • Handyman Service • Management • Space Planning • Landlord Relations • Help Desk • Furniture Management • Office Supplies Inventory • Emergency Management • Moves, Adds, Changes
2. Preventive Maintenance
• Snow Removal • Hazardous Waste Management • Storm Water Management • IAQ • Water Pollution Control
• Window Cleaning • Pest Extermination • Custodial • Landscaping • Food Services • Security Cards • Movers • Air Emissions Control
• After-Hours Support
• Lobby Reception • Dock Receiving • Ergonomic Programs • Systems Evaluations • Engineering Services • Construction Management
Energy tracking and benchmarking using “Energy Star” and Cassidy Turley’s best practices to reduce energy consumption.
3. Energy Management
4. Environmental Health & Safety
Management of IAQ and hazardous communication with sustainability in mind produces a safe, comfortable work environment.
Management of fire system detection, notification, and sprinkler suppression systems.
5. Fire Life Safety
Establishing Procedures
Attention to detail when maintaining building standards and finishes. This includes the front of the house, back of the house, exterior finishes, and landscaping.
6. Physical Asset
Standard Operating Procedure Manuals are customized, defining protocols, procedures, and expectations to ensure consistent and quality service. SOPs are tailored for each client, and include procedures for the following functions: • Crisis Management • Business Continuity Planning • Life Safety
7. Mechanical Equipment Management
Chilled and condenser water systems management to maintain efficiency and equipment life cycle.
Standard Operating Procedures
• Operational Procedures • Account Management • Performance Management • Reporting • Financial Management • Training
cassidyturley.com | 5
Transition & Quality Control
A Thoughtful Transition
Since 2010, through our seamless transition process, we successfully on-boarded 136 million square feet of managed property.
Transition & Quality Control Team
Key transition phases and priorities will include: 1. Planning: Form an experienced transition team to address critical functions. Develop an implementation calendar and goals with the client. Reaffirm objectives with regard to timing, communication, and priorities. 2. Relationship Building: Visit the facility and introduce the Cassidy Turley Team to key contacts. Provide communication for the transition and new processes. Meet regularly with key personnel to discuss major initiatives and approaches. 3. Technical Process: Complete facility inspections to gather equipment and property data; input into the technology platform. Setup policies and procedures. 4. Financial Analysis: Review the expenses and budgets if available for each facility. Develop new budgets based on existing information and benchmarking. 5. Transition Status: Ensure the alignment of goals as the transition progresses. Provide progress updates and any major initiatives or savings.
Transition Manager
Project Management
Procurement
Accounting
Managing Service, Quality and Value
Human Resources
Technology
Engineering
Cassidy Turley National & Local Resources
1: Analyze Spend
2: Financial Modeling
Detailed Transition Checklist
Transition Communication
Transition Newsletter
3: Define Goals & Desired Outcomes
Property Management
About Cassidy Turley
Quick Facts
Transition Newsletter
Our team of professionals is dedicated to consistently delivering solutions that produce superior results and champion Client business goals. We believe in face-to-face relationships and that hands-on problem solving is fundamental. We become your partner and advocate, and are passionate about achieving long-term success on your behalf.
• 455 million square feet of managed space • 60+ offices, 27 national markets • 3,500+ professionals • 28,000 managed Corporate Services locations • Partners with GVA outside of North America • Investor Services, Occupier Services, Practice Groups, and Specialty Services Welcome Team!
A 300 line item transition checklist that includes: • Pre-Transition Planning • Human Resources
4: Ensure Adherence to Contract Terms
We are pleased to announce that Cassidy Turley has assumed the management responsibilities of Client office locations effective August 1, 2012. To ensure your transition experience is one of team building and success, we will follow several guiding principles to mitigate risk and streamline the transition process. As a first step, we’ve assembled a top-notch transition team to lead us through the process. For the Client transition, the team will be comprised of the following members: • Account Executive – J Glasgow
Facility Transition Checklist
Our Core Values Fundamental to our success are our core values – our cornerstone principles. These principles reflect what is most important to us as a firm and are the foundation of our company’s culture. • Exceptional Results for Our Clients • Dedication to Our Communities • Growth for Our Company • Energizing Workplace for Our Associates Corporate Responsibility Cassidy Turley’s dedication to service leads us to make an active commitment to environmental sustainability and corporate responsibility. We encourage our tenants to join our efforts and urge everyone to take simple steps that can make a difference. We design our policies and business practices to reflect the highest standards of corporate ethics and governance. We are guided by our values and are focused on doing the best we can to better our communities. • Carpet/Flooring • Doors/Locks/Keys/Windows • Electrical • Exterior Repairs & Mainten ce
• Deputy Alliance Executive – Alex Fox • Transition Manager – Chris Barbour • Transition Coordinators – Alicia Riley and Travis Maune • Engineering Transition Manager – Kevin Brady
• Technology • Accounting • Training • Communication • Process Development • Vendor/Contract Management • Quality & Performance Metrics
The Facility Services Team is dedicated to providing world class facility management services at Client locations 24 hours, 7 days a week. Cassidy Turley is here to assist Client associates with almost any type of facility, oc- cupancy issues, and/or services. Below is a sampling of these services.
5: Streamline Processes
• Janitorial • Landscaping/Snow Removal • Lighting • Parking Lot/Garage • Plumbing • Security • Telephone/Communications/Media • Vending/Cafeteria • Waste Removal
1515 Arapahoe Street, Suite 1200 Denver, CO 80202 T 303-312-4232 • Exterminating • Fire/Life/Safety • Furniture/Move Management • HVAC • Interior Repairs & Maintenance After-Hours Answering Service If an associate has a building maintenance request or an emergency situation outside of normal operating hours, they can reach Cassidy Turley at (800) XXX– XXXX. This number goes directly to a live operator at the designated call center. If the request requires immediate attention, the operator will dispatch the call to a member of the Facility Services Team. All non-emergency work orders or requests will be processed the next business day.
6: Benchmark Performance
Transition Timeline
6 | Cassidy Turley
Financial & Operational Reporting
Service Level Agreements
Key Performance Indicators
Using the technology dashboard, standardized and customized reports are developed according to the frequency required. Sample reports include: • Management Plan: Business plan designed to meet your goals and expectations • Monthly & Annual Operational Reports: Month-end and year-end facilities performance
Priority
SLA Definition
Target SLA
Critical Environment Uptime Critical Dates Tracking Success Cost Savings Goals Based on a Baseline Budget Client Satisfaction Survey Results Energy Consumption Goals Response Time for Work Order Requests Adherence to Predictive and Preventive Maintenance Schedules Adherence to Change Management Protocols Efficiency Ratios MBE/WBE Percentage
Emergency
Work commenced within 4 hours
< 4 hours
Examples: Fire, Safety Issues, Utility Outage, Security Issue, Data Center Outage
• Service request volume • Completion time frames • Projects • Repair items • Maintenance schedule
High
Work commenced within 12 hours
< 12 hours
Examples: No HVAC, Plumbing Overflow, Electrical Issues
Standard
Work commenced within 2 days
< 2 days
• Physical Facility Reports: Routine facility-specific management plans • Capital/Major Project Lists: Provide the status of budgeted projects • Five-year capital/major project list – serves as a long term approach to maintaining the property • Periodic peer inspection reports by other Cassidy Turley managers • Building Occupant Satisfaction Survey: Satisfaction with management • Financial Reports: Monthly and year-to-date results • Financial statements • Management variance reports • Budget plans
Examples: Executive Requirement, Too Hot/Cold, Door Issues
Low
Work scheduled within 5 days
< 5 days
Examples: Light Out, MAC, Carpet, Paint
Quotes obtained and reviewed within 10 days
Quote/Bid
< 10 days
Examples: Multiple Bids, Larger Project, Equipment Requirement
Monthly Report
Work Orders
Cost Savings Initiatives
Value to Fee TTM -$2.44:1
February Services Summary
Cassidy Turley Invoice Tracking
WorkOrder Comparison
•85%ofworkorderswere completed atOak Summit •6%were completed inNY View
Terrace
Location
1000 1200 1400 1600
$100,000
$80,000
RealEstatePortfolio
Value toFee
FinancialPerformance
Value toFee TTM-$2.44:1
$60,000
Expenses February
H/Lvs.
PortfolioBreakdown SquareFootage
Sample Monthly Report
Projector Invoice Item
Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 TTM
•15%ofworkordersweremoveor furniture related •105preventativemaintenanceworkorderswere completed thismonth;PM closing ratio100% •34%ofNYworkorderswere for lighting
0 200 400 600 800
0 20 40 60 80 100
Actual YTD $1,294,022 ($129,915) ($141,376) ($284,974) 2012OPC 2011Actual
2010 2011 2012
AccountingFees
$671 $1,052 $1,098
$732
$732
$915
$732 $1,464
$915
$854
$793
$976 $10,934
$40,000
Type
Monthlymanagement fee
$18,747 $18,747 $18,747 $18,747 $18,747 $18,475 $18,475 $18,475 $18,475 $18,475 $18,475 $18,475 $223,062
0 5,000,000 10,000,000 15,000,000
9,526,091 7,849,304
Payroll
$0
$20,000
IdleFacilities
WS facilitiesmanagementpayroll
$99,953 $89,694 $88,027 $80,296 $93,707 $93,943 $93,441 $148,111 $94,473 $110,174 $93,323 $92,756 $1,177,899
Thousands
1,135,459
Travel
$0
$-
Facility
ExpectedExit FebruaryExpenses
Travel forFacilityManagement
$2,618 $3,813 $6,344
$344 $1,189
$526 $4,303
$432
$1,057
$1,110 $21,735
Mar-11
May-11
Jul-11
Sep-11
Nov-11
Jan-12
Travel for Idle Facilities
$0
Retail
Non-Retail
Owned
Weeks
12/31/2012 $69,184
Maintenance Supplies EmployeeDevelopment Dues&Subscriptions
$13,676 $15,271 $10,644 $6,905 $3,241 $12,352 $7,096 $5,874
$4,446 $8,354 $2,705 $90,564
Jul-11
February 2012
Jan-12
Jun-11
Oct-11
Apr-11
Sep-11
Feb-11
Aug-11 Fee
Dec-11
Nov-11
Mar-11
Value
MgtFee
May-11 Value
•63%ofworkorderswere reportedby facility services •The closing ratio for Februarywas99%
$207
$207
Retail
Non-Retail
Owned
Reported
$341
$179
$3,591 $2,852
$279
$621
$825
$242
$448
$9,378
*Calculatedas cost savingsdividedbymanagement fee
Phone Service
$76
$78
$79
($240)
$0
($6)
•February–$2.83:1 •TTM – $2.44:1
CostManagementDistribution February -$2.83:1 Miscellaneous Totals
Occupancy&SpacePlanning
Maintenance
Projects
Value to Fee
$160
$603
$567
$27
$435
$121
$629
$936 $1,888
$5,365
$136,243 $129,437 $125,508 $110,849 $120,229 $126,490 $125,103 $175,301 $113,863 $135,877 $121,881 $118,357 $1,539,138
MaintenanceHours %byLocation
TotalOccupancy
BradyTrane replacedRTU filters atOS
tTerraceView.
OakSummit TerraceView
90% 77% 89% 67%
16E34th St 2% 260Madison 4% WorkOrders by Location February -917
22%
NY 7%
CostSavings 13%
W-S (OS,NR,Weeks) TV, , ks)
Completed initial landscapingRFPatOakSummit.Willmaintain TerraceView.
Weeks 8%
NY
BuddGrouponaprobationarybasis
B,M& LA
Northridge 5%
Top5WorkOrderTypes ThisMonth's
Avg.CompletionTime (Minutes)
•FebruaryCost Savings: $36,579 •Maintenance-$6,945 •Expense Reduction Efforts - $2,709
Completedperformace reviews forFacilityServicesPersonnel
78%
WorkOrders ThisMonth YTD2012
2011
February Initiatives
Weeks 6%
• Management fee expense – $18,475 • Payroll expense – $92,756 • Accounting fees – $976
Began storageunitcleanout inNYreducedby65%
Furniture
102
48 20 23 36 47
43 22 25 40 45
47 22 31 48 42
Occupied Unoccupied
Oak Summit 80% View
Terrace
HVAC (Hot&Cold)
73
Prepared for: ClientName OfficePopulati n1,928 Therewere11movesduringthemonth YTDchurn r teof1.96% 5Februarymoveswere internal toOakSummit
February
ReplacementNYmaintenance technician inplace2/15
531NR 3%
Lighting
207 106 105
OS1 47%
Cost Avoidance 87%
Maintenance completed917workorders inFebruary 85%ofworkorders completedwere forOakSummit Theworkorderclosingratio forFebruary is99% TerraceView
Office Services
PM
•FebruarySavings - $7,845 •FebruaryAvoidance - $28,734
Distribution
OS2 38%
Security&Safety
Imaging
Scanned27,114pages forCustomerService,HumanResources,
Totalpostageusage forOS&Weekswas$11,168
85badges issued thismonth, monthly2012average is128
TV
6
736badgesmodified thismonth,monthly 2012average is657 andAccountsPayableduringthemonth
Achieved$690ofsavingsbysendingall firstclassmailpresort
©Copyright 2012CassidyTurley.All rights reserved.
• 2012 OPC –$1,606,567 • 2012 estimate –$1,594,500
64 IXO Incidents reported,monthly2012average is90
andutilizingpaddedenvelopes
12
2012
Fleet
Healthfit
Amenities
Thereare currently391vehicles,3 trailers,1 forkliftand1
Healthfithad1,966participants for themonth;YTDAvg is2,043 InFebruary,12%ofemployees atebreakfastand20%ate
pieceofheavymachinery in theHBIFleet
Healthfitoffered19group fitness classes
lunchonsiteatThreads café OSClothingCarehad128 customers and$3,620 in sales
7
cassidyturley.com | 7
Critical Environment Management
Data Center Tier Levels
Critical Environment Management provides the necessary support processes and procedures required to achieve the “100% Up-Time” requirements for continual critical system operation. We focus on the reliability and operational integrity of all critical systems. Our mission is to eliminate system failures. Standardized processes and procedures include:
• 99.982% availability • Annual downtime is 1.6 hours • Multiple power and cooling paths • Fault tolerant (N+1) • Able to sustain 72-hour power outage
TIER • 99.671% availability
TIER
• Annual downtime is 28.8 hours • Single path of power and cooling • No redundant components
3
1
• System reliability & commissioning • Operational sequences by system(s) • System monitoring and response • Proactive, predictive, & preventative maintenance • Associate & facility specific training • Strategic alliances with vendor partners • Inter-group communication procedures • CEM team supervision and support • Staffing processes aligned with critical system operations
• 99.749% availability • Annual downtime is 22.0 hours • Single path of power and cooling • Some redundancy in power and cooling systems
• 99.995% availability • Annual downtime is 0.04 hours • Two independent utility paths
TIER
TIER
2
4
• Fully redundant (2N+1) • Able to sustain 96-hour power outage
Organizational Structure
Proven Results
Edward Jones St. Louis, MO & Tempe, AZ 115,000 SF Data Center 1.9 Million SF Project Size 5,400 UPS (Kva) 9,700 Kw Generator Backup US Bank St. Louis, MO 300,000 SF Processing Center Operates 24/7 1.6 Million SF Project Size 1,000 UPS (Kva) 3,000 Kw Generator Backup
• Directed ISO 9000 Certification for both facilities • Standardized and documented over 300 facility management processes and procedures, industry-best practices and benchmarking, and enacted extensive training and technical staff development programs • 100% up-time over the past 6 years • Manage all infrastructure to ensure 24/7 operations • Developed processes to properly maintain the facility while reducing operating expenses • Maintained 100% up-time • Accomplished zero FDA or Red Cross Audit Team observations relating to facilities • Replaced six roof top air conditioning units while maintaining ab temperature requirements • Vital blood collection and processing continued uninterrupted during Donor Center build outs, carpeting upgrades, and critical systems preventive maintenance
Client Relationship Manager
Facilities Manager
Cassidy Turley Resources • Transition Team • Operations • Project Management • Process Control • Accounting • Engineering Services • 24/7 Call Center
Manager of Technical Operations
American Red Cross Various Locations
Data Center Supervisor
110,000 SF Headquarters 64,108 SF Donor Centers 24,000 SF Warehouse 7,400 SF Call Center Mission Critical Operations
Data Center Technician
8 | Cassidy Turley
Sustainability Services
100+ LEED accredited professionals nationwide delivering integrated, tailored solutions to maximize sustainable opportunities for every class of real estate.
Overseeing more than 17 million sf of LEED certified projects and 25 million sf of ENERGY STAR buildings.
Firmly rooted in cutting edge technologies and best practices throughout the industry.
Scope of Services
Partnerships
Proven Results
Select Clients
Sustainability Visioning
Energy Procurement Advisory
LEED EB - Platinum
LEED EB - Gold
LEED CI - Certified
Operating Efficiencies Consulting
Beacon Capital Partners & GE Washington, DC Size: 522,000 SF
750 East Pratt Street, LLC Baltimore, MD Size: 364,177 SF Project Highlights: • Developed a robust LEED certification strategy • Reduced annual energy consumption by 42%, increasing the ENERGY STAR score from 26 to 76 in 12 months saving an estimated $705,000 annually • Diverted more than 50% of all ongoing consumables and 100% of all durable goods and electronic waste from the landfill
Hanesbrands, Inc. United States, Latin America, Asia Size: 24 million SF Project Highlights: • First LEED certified project in Bentonville, Arkansas, and the first LEED CI certified project in the state • Lighting design reduced the installed wattage of fixtures by 30% below the baseline standard • Installed solar panels at HBI’s Winston-Salem headquarters, reducing annual greenhouse gas emissions by nearly 100,000 pounds of carbon dioxide
ENERGY STAR ® Benchmarking
Project Highlights: • First Trophy Office Building to achieve LEED EB-Platinum in DC • 19 month payback for the entire LEED EB process and energy efficiency improvement costs • Purchased Renewable Energy Certificates and Carbon Offsets to offset 100% of the building’s energy consumption • Achieved ENERGY STAR certification for two consecutive years
Utility Control and Tracking
Employee Participation Programs
Environmental Risk Mitigation
LEED Certification Project Management
cassidyturley.com | 9
Technology Solution
Feature
Benefit
Function Sample Technology Scorecard Our Technology Solutions Group evaluates Facilities Management technology through the foll wing tools: • Client Technology Assessments provide a collaborative understanding of the current technology capability and a customized solution to achieve strategic goals. 360Facility Corrigo Angus Service Express Facilities Management Scorecard
Service Level Agreement & Key Performance Indicator Engine Dashboard & Reporting Engine
• Increase accountability and service performance. • Detailed tracking of SLA information.
• Graphical display of actionable information.
• Enter and track billable and non-billable work orders through the billing/accounting process. • Since all data is centralized and accessible, reports can be created to identify specific areas that require attention. • Response time is lowered. • Deliver automatic notifications based on a specific request. • Graphic interface to review, assign, and balance tasks among the maintenance team.
Call Center / Service Request Preventative Maintenance Asset Lifecycle Management Warranty & Contract Management Timesheet Management Emergency Notification System Incident Management Mobile Management Project Management Conference Reservations Email Integration / Notifications Fire & Life Safety Request Document Management Tenant Cost Estimate Approvals Online Tenant Handbook Request Workflow Configurability Customer Satisfaction Survey Tenant CRM Security System Integration (bar code printing & data exch.) Sustainability Management Web-based platform Integration Flexibility (Maps, Systems) Reporting (Integr ted & Flexible) Dashboards (Tactical) Configurable Fields Full Support of ACORD Form SAS 70 Type II Audit
• Technology Scorecard enables us to qualify and quantify market technology providers both initially and as they mature. • Customized solution developed according to the requirements of the client organization and implemented to satisfy optimization of business processes. Cassidy Turley supports multiple toolsets and determines the best suited technology platform for our clients’ long-term needs.
Track Labor Costs, Material Costs and Comment History
Notification Engine
Work Planning
Project Management
• Capture all the elements of a project in one place
• Real-time updates and notification, increasing efficiencies.
Wireless & Mobile Solutions
Dashboard Reporting
Detailed Service Level Tracking & Reporting
Asset Tracking & Task Scheduling Actual listing of an asset and upcoming schedules and a link to the asset history
10 | Cassidy Turley
Project Management
Integrated Project Management Managing all details of your project from design to close out Reducing and Controlling Costs Leveraging our national platform and managed approach that drives significant project savings
Recent Projects
A Culture Designed to Optimize Project Performance Collaborative approach aligned to our clients requirements
Capital One Headquarters McLean, VA 1.5 M SF & 2.5 M SF
RGA St. Louis, MO 400,000 SF
Yahoo! Headquarters Campus Sunnyvale, CA 1 M SF
Managing the entire project lifecycle:
Vendor & Contract Management
Design Development
Communication
Managing the Project
Project Close Out
Managing Your Move
• Perform punch list inspections at completion of the project and ensure follow-up to address all items. • Confirm all close out documents are prepared and submitted by the contractor to include warranties, operations manuals, as-built drawings, invoices, etc. • Review the lease and provide package for submittal
• Manage the project through the entire lifecycle, delivering an average 15-25% savings of the project cost. • Perform a facility review and prepare a project summary, schedule, and target budget for all line items necessary to accomplish the project objectives. • Technology platform enables project managers develop process schedules, automated
• In-house design teams develop designs and space standards for each client. • Coordinate design activities with the client and other functional areas, such as IT, HR, furniture vendors, etc. • Develop design standards and processes into a project management guidebook to ensure consistency of services and results across project types.
• National sourcing team augmented by regional sourcing subject matter experts. • Vendor Management System provides tracking of more than 4,000 vendors, contractors and suppliers to ensure consistent quality and risk mitigation through contract and insurance management. • Leverage our national platform to reduce contract and vendor costs by 15%-30% without compromising service delivery.
• End to end coordination of Moves/Adds/Changes and full integration of services within departments to ensure a smooth transition. • Tasks include floor plan configurations, furniture/cubicle acquisition, coordinating box moves, technology set ups, and AutoCAD floor plan revisions. • Provide space programming, forecasting, stacking and planning scenarios, occupancy/ vacancy review, financial review.
• As the single point of accountability, our teams work with clients to ensure the appropriate local resources are selected for the requirements. • Serve as the client’s representative, inspecting and managing projects. • Communicate status updates, goals, budgets, etc. regularly through client meetings and reporting.
and collection of Tenant Improvement allowance.
correspondence, and standardized forms.
cassidyturley.com | 11
Generating Value
Category
Estimated PSF Savings Examples
Innovative Savings for Our Clients $400,800 In annual furniture expense reduction through a new reallocation program 9% Annualized snow removal savings by implementing a new client-approved scope of services with the vendor $112,100 In annual mailroom savings through re- engineered processes 12% Energy savings realized by installing motion sensors and LED lights and aligning operation with hours of occupancy $181,700 Annual energy savings attained through new energy management strategies and curtailment agreements 5% Annual savings from purchasing rubber mat service to protect the floor, thus prolonging the life of the floor and minimizing floor refurbishment costs $25,200 Yearly storage savings created through vendor management strategies
Review maintenance responsibility language; push back on landlords
Lease Responsibilities
$0.10-$0.25
Review terms and adjust service level agreements
Contract Management
$0.01-$0.15
Leverage national relationships and standardize pricing
Procurement
$0.01-$0.20
Bid out goods and services to obtain best pricing
Bidding of Goods & Services
$0.05-$0.30
Review current contracts and service level agreements
Janitorial
$0.05-$0.25
Streamline process
Records Retention
$0.01-$0.05
Review capital expenses and multiple bid projects
Capital Expenses
$0.10-$0.35
Compare CAM reconciliations and invoices to service agreements and leases to verify charges
Operating Expenses
$0.10-$0.20
$0.05-$0.15
Facility issue tracking to aid strategic portfolio management
Delivery Model/Reporting
$0.01-$0.05
Review services offered and costs
Vending Services
$0.10-$0.75
Perform electric rate analysis
Electrical Utility
$0.05-$0.10
Review repair and maintenance program
Parking Lots
$0.01-$0.25
Review contract coverage and services rendered
Security
$0.05-$0.30
Multiple bid services and review existing contracts
Landscaping/Snow Removal
$0.01-$0.15
Utilize national vendor for service
Fire/Life/Safety
$0.01-$0.10
Install programmable thermostats and establish temperature set points
Building Operations
$0.01-$0.05
Install low-flow water fixtures
Plumbing
$0.10-$0.50
Utilize existing systems to full capabilities
Building Automation System
$0.15-$0.65
Proper work to extend life of equipment
HVAC
$0.10-$0.25
Establish a PM program to extend equipment lifecycle
Preventive Maintenance
$0.01-$0.15
Utilize exterior lighting at appropriate times and install automatic lights where applicable
Lighting
$0.01-$0.10
Review current contracts and service level agreements
Pest Control
$0.01-$0.05
Track and review warranties
Equipment Warranties
$0.15-$0.75
Review facilities management staffing and staff appropriately
Staffing
Total Opportunity
$1.26 - $6.10
12 | Cassidy Turley
Cassidy Turley Overview
Global Coverage
Cassidy Turley is a national team of commercial real estate professionals with a proven track record of delivering superior results for our clients. We are dedicated to consistently providing solutions that are creative, cost-effective and responsive to our clients’ specific real estate needs, while supporting overall business performance. We are a trusted partner and advocate, supporting our clients’ long-term success by leveraging industry insight, world-class expertise and local market knowledge to provide commercial real estate investors and occupiers with comprehensive services around the globe. • 60 offices • 3,700 professionals • 900 brokers • 455 million sf managed portfolio • 28,000 managed Corporate Services locations • $57 million average savings delivered for Corporate Services clients over the past 2 years • $22 billion in transaction volume in 2011
EUROPE
ASIA
AUSTRALIA & NEW ZEALAND
Cassidy Turley Locations Cassidy Turley Client Locations GVA Locations
SOUTH AMERICA
NORTH AMERICA
AFRICA
Alaska
Hawaii
Representative Clients
Rexel Holdings USA
cassidyturley.com | 13
Global Services & Capabilities
Providing the Depth of Resources and Breadth of Expertise to Drive Measurable Value
Strategic Consulting
Transaction Management • Market Research • Site Selection • Capital Markets/Sale Leasebacks • Acquisition and Leasing • Dispositions and Subleasing • Contract Negotiations and Strategy
Project Management • Program Management • New Construction • Tenant Improvements • Moves, Adds, and Changes • Capital Projects • Sustainability Consulting
Facilities Management • Facilities Management • Property Management • Supply Chain/Vendor Management • Critical Data Centers • Maintenance and Engineering • Facilities Audit and Assessment • Energy and Sustainability Programs • 430 million SF under management • Managing annual total spend of $3.4 billion • Processing more than 3 million work orders annually
Portfolio Administration • Lease Administration • Lease Abstracts • Accounting and Financial Reporting • Lease Audit and Reconciliation • Payables Management • Asset Tracking • CAM Reconciliations • 23,170 leases in database • 315,000 invoices paid monthly • More than 50 Lease Administrators • Delivering more than $6 million in annualized savings
• Portfolio Optimization • Portfolio and Location Strategies • Economic Incentives • Labor and Demographics • Econometric Forecasting • GAAP and Financial Advisory • Workplace Strategies • 45 U.S. Consultants and Research Analysts • US Labor and Economic Incentives in 48 States
• 14,900 leases in 2010 • 1,500 sales in 2010 • $17 billion in transaction value • 940 brokers in U.S.
• 250 major projects, 3,600 minor projects underway • $500 million total project cost • Average savings of 5 to 10% of project costs
Graybar • Assessment of one key market within client’s national portfolio, plus corporate properties identified annualized savings opportunities in excess of $1.9 million • Projected savings across entire portfolio equate to $22.7M, or a reduction in cost of occupancy of nearly 20%
Edward Jones • Manage a portfolio of 11,000 locations, including corporate headquarters campus, data centers, and retail branch offices • Opened 10,000 new locations in 16+ years • Renew 1,200 to 1,900 leases annually;
Centene • 17-floor, 550,000 SF corporate headquarters project • 972-car garage • LEED Certified • Delivered $2.5 million in total project savings
Hanesbrands, Inc. • On-site management of 30 million SF total portfolio • Headquarter savings > $1.00/SF in 18 months • Developed and implemented sustainability program
Siemens • Portfolio administration for more than 760 locations and 34.5 million square feet • Delivered more than $5 million in portfolio savings • Maintained 100% success rate in all Key Performance Indicator areas
have completed more than 14,000 renewals over life of partnership
14 | Cassidy Turley
Successful Partnerships
Client Tenure Partnership since 1997 Locations United States & Canada Real Estate Type Corporate Headquarters, Branch Offices, and Data Centers Portfolio Portfolio Scale 12,000 Locations 14.6 Million SF Cassidy Turley Service
Client Tenure Partnership since 1974 Locations United States Real Estate Type Corporate Headquarters, Administrative Office, and Data Center Portfolio Portfolio Scale 1.4 Million SF Regional Administrative Properties Cassidy Turley Service • Facilities & Property Management • Transaction Management • Project Management
Client Tenure Partnership since 2006 Locations United States, Latin America, Asia, & EMEA Real Estate Type Office, Industrial, and Manufacturing Portfolio Portfolio Scale 1.4 Million SF Corporate Headquarters 15 Million SF US & International Locations Cassidy Turley Services • Facilities Management • Portfolio Administration • Transaction Management • Sustainability Consulting • Project Management Client Reference Kevin Dollhopf Vice President of Worldwide Real Estate kevin.dollhopf@hanesbrands.com Real Results • Savings of more than $1 per square foot in operational costs within 18 months by streamlining processes and developing accurate service level agreements. • Infused a LEAN process improvement approach to facility operation. • Reduction of greenhouse gas emissions by 100,000 pounds through two solar projects designed for the internal use of power that allows for resale of excess power to the local utility company.
Client Tenure Partnership since 1999 Locations United States Real Estate Type Corporate Headquarters, Retail, and
Client Tenure Partnership since 2005 Locations United States & International Locations Real Estate Type Regional Headquarters and Sales Offices Portfolio Cassidy Turley Services • Facilities Management • Portfolio Administration • Transaction Management • Project & Sustainability Management Client Reference Catherine Hays Director of Workplace Resources catherine.hays@netapp.com Portfolio Scale 150 Locations 2.2 Million SF Real Results • Successfully completed the rebranding/ signage replacement project within 30 days to ensure all of NetApp’s U.S. offices were brand compliant. • Reclaimed an additional $115,000 of savings through in depth review of general landlord and vendor invoices. • Completed more than 240 facility cases annually and expanded services to include contract and insurance tracking fir all contractors/vendors.
Office Portfolio Portfolio Scale 6,200 Locations 11 Million SF
Cassidy Turley Services • Facilities Management • Portfolio Administration • Transaction Management • Project Management Client Reference Tom Nist Director of Real Estate TNist@hrblock.com
• Facilities Management • Portfolio Administration • Transaction Management • Construction & Design
Client Reference Kristin Layeaux Senior Property Manager kristin.layeux@usbank.com
Client Reference Tod Huddleston Senior Project Leader tod.huddleston@edwardjones.com
Real Results • Saved $1.6 million in 2010 on 30,000 branch facility cases for a geographically dispersed portfolio. • Facility savings derived through strict interpretation of lease language, enforcing landlord responsibility for facility issues, multiple bidding projects, and value engineering. • Managed lighting retrofits for 6,500 branches, ultimately reducing energy spend by 40%.
Real Results • US Bank Plaza received BOMA’s 2010 TOBY Award and BOMA’s Workspeed Performance designation for excellence in building operations and management. • Mechanical and electrical upgrades to properties resulting in a reduction of $100,000 per year in utility costs. • Gains in operational efficiency and technology implementation resulted in reduced staffing costs equating to $275,000 per year.
Real Results • Achieved savings of $290,000 through facilities management at 5,800 nationwide locations. • Resolved 9,300 facility cases and reviewed 6,200 facility-related invoices in 2011. • Reviewed overall facility operational costs for corporate headquarters locations; implemented team consolidation and process changes to save more than $1 million in first year savings.
cassidyturley.com | 15
Made with FlippingBook