Asia Pacific Data Construction Cost Guide 2025
BANGKOK
HANOI & HO CHI MINH CITY
Cost
Cost
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Cluster Land / Site Purchase Cost
Unit
Cluster Land / Site Purchase Cost
Unit
Low
Mid
High
Low
Mid
High
Bangkok
$ / SQM
$2,242
$3,737
$5,232
Hoa Lac Hi-Tech Park
$ / SQM
$87
$109
$131
2% 1%
East Bangkok / Samut Prakan
$ / SQM
$747
$1,868
$2,990
HCMC CBD - Tan Thuan EPZ
$ / SQM
$213
$344
$515
5%
5% 9%
7%
11%
12%
28%
1%
10%
Nonthaburi
$ / SQM
$747
$1,495
$2,616
Rest of HCMC
$ / SQM
$240
$281
$336
9%
13%
EEC
$ / SQM
$84
$229
$252
Saigon Hi-tech Park
$ / SQM
$76
$102
$125
8%
20%
13%
Blended Land Purchase Cost
$ / SQM
$955
$1,832
$2,772
Blended Land Purchase Cost
$ / SQM
$154
$209
$277
7%
26%
10%
Cost
Cost
Construction Cost
Unit
Construction Cost
Unit
1%
Low
Mid
High
Low
Mid
High
1%
Cost Per Watt
$ Per Watt
$6.05
$7.67
$9.28
Cost Per Watt
$ Per Watt
$5.48
$6.94
$8.40
1%
Cost Per MegaWatt
$ Per MegaWatt
$6,054,469 $7,668,994 $9,283,519
Cost Per MegaWatt
$ Per MegaWatt
$5,475,473 $6,935,600 $8,395,726
Economic Indicators
2022 Rate
2023 Rate 2024 Rate
2025 Rate
Economic Indicators
2022 Rate
2023 Rate 2024 Rate
2025 Rate
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
GDP Growth Inflation Rate
2.50% 5.90% 1.25%
1.90%
2.70% 1.30% 2.25%
2.70% 1.80% 2.25%
GDP Growth Inflation Rate
8.20% 4.40% 5.75%
5.00% 3.60% 4.50%
6.70% 3.30% 4.50%
6.30% 3.40% 5.00%
-0.50% 2.50%
Central Bank Rate
Central Bank Rate
Construction Cost Year Over Year % Change 3.00% Applied Local FX Rate
Construction Cost Year Over Year % Change 3.50% Applied Local FX Rate
1 USD = 34.42 THB
1 USD = 24265VND
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
Notes: •
CUSHMAN & WAKEFIELD | ASIA PACIFIC - DATA CENTRE CONSTRUCTION COST GUIDE 2025
25
Made with FlippingBook - Online catalogs