Asia Pacific Data Construction Cost Guide 2025
SINGAPORE
BUSAN & SEOUL
Cost
Cost
Cluster Land / Site Purchase Cost
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Cluster Land / Site Purchase Cost
Unit
Unit
Low
Mid
High
Low
Mid
High
Dong-gu
$ / SQM
Bedok - Tampines
$ / SQM
$1,007
$1,329
$1,343
853
2,607
9,071
Gurang Dong
$ / SQM
465
1,003
1,285
6%
4% 7%
Loyang
$ / SQM
$823
$1,085
$1,097
15%
11%
Rest of Busan
$ / SQM
8%
521
1,892
10,194
41%
1% 1% 10%
Paya Lebar
$ / SQM
$2,170 $2,864
$2,894
12%
Seongnam
$ / SQM
1,136
4,135
11,595
16%
South Gyeonggi
$ / SQM
Sunview - Jurong
$ / SQM
$1,157
$1,526
$1,542
8%
453
4,936
11,768
1%
Incheon / West Gyeonggi
$ / SQM
Blended Land Purchase Cost
$ / SQM
$1,289
$1,701
$1,719
24%
1,826
5,256
10,381
11%
8%
7%
6%
Gangnam
$ / SQM
28,448
59,266
148,641
Cost
SouthWest Seoul
$ / SQM
Construction Cost
Unit
3,594
8,750
12,565
Low
Mid
High
Blended Land Purchase Cost
$ / SQM
$4,662
$10,981
$26,937
Cost Per Watt
$ Per Watt
$9.27
$11.74
$14.21
1% 1% 1%
Cost Per MegaWatt
$ Per MegaWatt
$9,268,628 $11,740,262 $14,211,896
Cost
Construction Cost
Unit
Low
Mid
High
2022 Rate 3.80%
2023 Rate 1.10%
2024 Rate
2025 Rate
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
Economic Indicators
Cost Per Watt
$ Per Watt
$7.50
$9.50
$11.51
GDP Growth Inflation Rate
3.70% 2.80%
Cost Per MegaWatt
$ Per MegaWatt
$7,503,756 $9,504,758 $11,505,759
6.60% 4.00% 1.80%
1.90%
Central Bank Rate
2.95% 3.70% 3.10% 2.40%
Economic Indicators
2022 Rate
2023 Rate 2024 Rate
2025 Rate
GDP Growth Inflation Rate
2.70% 5.30% 3.25%
1.40% 3.40% 3.50%
2.20% 1.60% 3.00%
1.80% 2.10% 2.25%
Construction Cost Year Over Year % Change
4.50%
1 USD = 1.3197 SGD
Applied Local FX Rate
Central Bank Rate
Construction Cost Year Over Year % Change 3.00% Applied Local FX Rate
1 USD = 1295.995 KRW
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
Notes: • •
24
CUSHMAN & WAKEFIELD | ASIA PACIFIC - DATA CENTRE CONSTRUCTION COST GUIDE 2025