Asia Pacific Data Construction Cost Guide 2025
AUCKLAND
CLARK, METRO MANILA & PROVINCIAL (LAGUNA, CAVITE, BATANGAS)
Cost
Cost
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Cluster Land / Site Purchase Cost
Unit
Cluster Land / Site Purchase Cost
Unit
Low
Mid
High
Low
Mid
High
Cavite
$ / SQM
$163
$196
$228
North
$ / SQM
$771
$872
$1,039
1%
Laguna
$ / SQM
$165
$204
$243
1%
Takanini
$ / SQM
$731
$771
$872
7%
7%
13%
1%
11% 4%
11%
1%
12%
Batangas
$ / SQM
$149
$176
$204
1% 1%
10%
Central
$ / SQM
$905
$939
$1,006
Pampanga
$ / SQM
$146
$172
$198
9%
12%
14%
Cebu
$ / SQM
$110
$141
$171
Westgate
$ / SQM
$570
$637
$704
8%
13%
Davao
$ / SQM
$110
$130
$149
Blended Land Purchase Cost
$ / SQM
$744
$805
$905
12%
24%
Blended Land Purchase Cost
$ / SQM
$141
$170
$199
27%
Cost
Construction Cost
Unit
Cost
Low
Mid
High
Construction Cost
Unit
Low
Mid
High
Cost Per Watt
$ Per Watt
$7.31
$9.26
$11.21
Cost Per MegaWatt
$ Per MegaWatt
$7,310,491
$9,259,955 $11,209,420
Cost Per Watt
$ Per Watt
$5.52
$6.97
$8.41
Cost Per MegaWatt
$ Per MegaWatt
$5,520,000 $6,966,214 $8,412,427
Economic Indicators
2022 Rate
2023 Rate 2024 Rate
2025 Rate
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
Economic Indicators
2022 Rate
2023 Rate 2024 Rate
2025 Rate
GDP Growth Inflation Rate
2.20% 7.20% 3.80%
0.90% 4.70% 5.50%
0.60% 2.00% 4.60%
1.50% 2.20% 3.00%
GDP Growth Inflation Rate
7.70% 7.90% 5.50%
5.60% 4.20% 6.50%
5.80% 3.00% 5.75%
6.00% 3.30% 5.10%
Central Bank Rate
Central Bank Rate
Construction Cost Year Over Year % Change 3.00% Applied Local FX Rate
Construction Cost Year Over Year % Change 3.90% Applied Local FX Rate
1 USD = 1.582529 NZD
1 USD = 55.375 PHP
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
Notes: •
CUSHMAN & WAKEFIELD | ASIA PACIFIC - DATA CENTRE CONSTRUCTION COST GUIDE 2025
23