Office Evolution Overview
SAMPLE FLOOR PLANS
7,000 SQUARE FEET
Finish Plan General Notes
Finish Plan Key Notes
Symbol Legend
Submittals - Contractor to submit samples of all finishes to NELSON for approval prior to ordering/installation.
Floor Finish - Transition
1. Existing Surfaces Repair The Contractor shall retouch or refinish surfaces damaged by subsequent work. 2. Existing Surfaces
Office 114
Office 115
Key - Floor Finish
CPT-1
Office 116
Office 117
Office 118
Corner Guard - Provide and install wall edge protection on all outside corners. Specification: TBD
Office 113
Contractor shall examine all surfaces to be finished under this contract and see that the work of their trades has been installed in satisfactory condition to receive paint, stain or specified finish. The application of the first coat of any finish process shall constitute acceptance by the Contractor of the surface. 3. Existing Finishes Where new finishes are adjacent to existing finishes, materials shall be installed with no definitive transitions between existing and new finishes. 4. Material Packaging/ Storage/ Installation Materials shall be delivered in their original cartons as packaged by the manufacturer and must bear the original manufacturer's labels. Contractor will be responsible for receiving and storing such goods. Materials stored on the site shall be protected from damage by moisture, wind, sun, abuse or any other harmful affects. Damaged materials will be rejected and must be replaced. All materials shall be installed and finished according to manufacturer's specifications. 5. Preparation for Installation Contractor shall examine conditions concerning substrates and surfaces where finish work is to be performed. All substrates and surfaces to receive finishes shall be free of dirt and debris prior to installation. Both the substrate and surface preparation shall be in accordance with the manufacturer's recommendations. 6. Carpet Contractor shall submit three (3) sets of carpet samples to NELSON for approval prior to field execution. Contractor shall ensure that carpet supplied for an individual installation be from the same manufacturing run, of uniform color, texture and pattern. 7. Carpet Installation All flooring shall be installed per manufacturer's recommendations regarding adhesives, seaming, direction, etc. Carpet installer shall ensure that carpet nap runs in the same direction. Carpet to carpet transitions at door shall occur directly under line of closed door. 8. Carpet Stock The Contractor shall verify whether or not the Tenant would like to store any large usable carpet remnants prior to discarding. 9. Base Contractor shall allow rubber base to run continuous around corners. Do not use pre-molded base or pieces less than 18" long. Base material shall be installed flush to floor surface. 10. Transitions Contractor shall provide rubber transition strips between carpet and LVT/VCT to match rubber base. 11. Paint All painted surfaces shall receive manufacturer's recommended primer coat and (2) coats minimum specified finish. 12. Paint Submittals Contractor shall submit three (3) sets of 8" x 10" paint samples to NELSON for approval prior to field execution. 13. Paint Stock Contractor shall leave remaining paint (1 gallon minimum) of each color clearly labeled with "Color Name" and Finish Key "P-#" with Tenant for future touch-up needs. 14. Wallcovering Wall or surfaces with wallcovering finishes shall be primed with sizing prior to wallcovering installation. Wallcovering installations shall not terminate at outside corners or reveals. If it is necessary to terminate wallcovering on a flat wall or outside corner, provide edge mold: Outside Corners: Koroseal, Korogard OC12 Aluminum Outside Corner Trim Piece Flat Walls: Koroseal, Korogard JC12 J-Molding 15. Clean Up Upon completion of all finish applications, all materials and equipment shall be removed. Contractor shall ensure that paint and glue spots are removed and that all areas are left clean and free of dust, dirt and debris. 16. Interior Finish Code Compliance Finish requirements per 2012 NFPA 101 Section 38.3.3 Interior Finish for New Business Occupancies: 38.3.3.1 Interior finish shall be in accordance with Section 10.2. 38.3.3.2.1 Interior wall and ceiling finish material complying with Section 10.2 shall be Class A or Class B in exits and in exit access corridors. 38.3.3.2.2 Interior wall and ceiling finishes shall be Class A, Class B, or Class C in areas other than those specified in 38.3.3.2.1. 38.3.3.3.1 Interior floor finish shall comply with Section 10.2. 38.3.3.3.2 Interior floor finish in exit enclosures shall be Class I or Class II. 38.3.3.3.3 Interior floor finish shall comply with 10.2.7.1 or 10.2.7.2, as applicable. 12 13 14 15 16
CPT-2
CPT-2
Key - Wall Finish
P-1
CPT-2
CPT-2
CPT-2
CPT-2
Key - Note
F1
Finish Schedule CPT-1 Carpet Tile Manufacturer: Patcraft Style: Color Pop 10381 Color: Retro Pop 00650 Installation: Coordinate with Tenant
P-1 Paint Manufacturer: TBD Color: TBD Two (2) coats eggshell To be used throughout unless otherwise noted. P-2 Trim Paint Manufacturer: TBD Color: TBD Two (2) coats semi-gloss To be used on h.m. frames throughout.
Office 112
CPT-2
Office 119
Office 123
Office 120
Office 122
Office 121
To be used throughout unless noted otherwise. Contact Tracy Roan with Patcraft @ 404.316.4631 CPT-2 Carpet Tile Manufacturer: Patcraft Style: Color Block 10382 Color: 00650 Installation: Coordinate with Tenant To be used where indicated. Contact Tracy Roan with Patcraft @ 404.316.4631 LVT-1 Luxury Vinyl Tile Manufacturer: Patcraft Style: North Ridge 1206V Color: Irish Cream 02150 Size: 3 x 36 Pattern: Coordinate with Tenant To be used where indicated. Contact Tracy Roan with Patcraft @ 404.316.4631
CPT-2
CPT-2
CPT-2
CPT-2
CPT-2
Office 111
CPT-2
P-3 Accent Paint Manufacturer: TBD Color: TBD Two (2) coats eggshell Locations TBD PL-1 Plastic Laminate Manufacturer: Formica Color: Ebony 9012 See Details PL-2 Plastic Laminate Manufacturer: Formica Color: Neutral Weft 5875 See Details
Office 110
Office 108
Office 124
Office 125
CPT-2
CPT-2
CPT-2
CPT-2
Office 109
CPT-2
CPT-1 P-1 RB-1
Typ. Typ.
Office 106
Break 126
Typ.
Office 107
VCT-1 Vinyl Composition Tile Manufacturer: TBD Style: TBD Color: TBD Size: 12 x 12 To be used where indicated.
CPT-2
CPT-2
Copy/Mail 128
Office 105
RB-1 Rubber Base Manufacturer: Johnsonite Style: 4" Cove Color: 48-Gray To be used throughout.
Drop In 127
CPT-2
Conference 2 129
Office 104
CPT-1
CPT-2
Reception 100
IT 130
VCT-1
LVT-1
Office 103
Conf. 1 131
Office 102
Office 101
CPT-2
CPT-1
CPT-2
CPT-2 23
36
35
34
33
32
31
30
29
28
27
26
25
24
22
21
20
19
18
17
11
10
09
08
07
06
05
04
03
A.
REFER TO SHEET A201 FOR FINISH LEGEND AND S FINISH PLAN IS NOT REPRESENTATIVE OF ALL FINI DETERMINE AVAILABILITY OF ALL MATERIALS DUR BIDDING AND PRICING PHASE. BRING ANY DELIVE MAY CAUSE COORDINATION PROBLEMS DURING T STAGES OF CONSTRUCTION TO THE ATTENTION O ARCHITECT AS SOON AS POSSIBLE. EXTEND ALL FINISHES (INCLUDING PAINT) BENEAT AND AROUND ALL NEW AND EXISTING TO REMAIN CASEWORK, EQUIPMENT, SIGNAGE, ETC. WHETHE INDICATED OR NOT. PROVIDE AND INSTALL RUBBER TRANSITION STRIP RUBBER BASE BETWEEN CARPET. REFER TO SHE FOR FLOOR TRANSITION DETAILS. ALIGN ALL FLOORING TRANSITIONS WITH CENTER DOOR OR FACE OF ADJACENT WALL UNLESS NOTE OTHERWISE. PROVIDE LEVEL 5 FINISH AT ALL DIRECT APPLIED GRAPHIC/FILM WALLS AND MARKERBOARD PAINT
Z
B.
Finish Plan Scale: 1/8" = 1'-0"
1 I-7
Y
11,000 SQUARE FEET
C.
X
D.
W
E.
F.
V
OFFICE 137
OFFICE 144
G.
FLOORING TO BE CPT-01 UNLESS NOTED OTHERW
OFFICE 145
OFFICE 139
OFFICE 140
OFFICE 141
OFFICE 142
OFFICE 143
H.
WALL BASE TO BE RWB-01 UNLESS NOTED OTHER
U
I.
WALL FINISH TO BE PNT-01 UNLESS NOTED OTHER
DROP-IN 138
J.
DOOR FRAMES TO BE PNT-05 UNLESS NOTED OTH
T
K.
GYPSUM BOARD CEILINGS AND SOFFITS TO BE PN UNLESS NOTED OTHERWISE.
1 TYP.
OFFICE 136
1 TYP.
OFFICE 146
S
OFFICE 131
OFFICE 135
OFFICE 134
OFFICE 133
OFFICE 132
GENERAL NOTES 1/8" = 1'-0"
R0
R
2
OFFICE 130
Q
OFFICE 147
OFFICE 124
2" STAINLESS STEEL 4' HIGH CORNER GUARD AT ALL OUTSIDE CORNERS, ABOVE BASE, TYP.
1
OFFICE 126
OFFICE 127
ALIGN FINISHES
2 3
BREAKROOM 125
P
MATCH EXISTING FINISHES
OFFICE 129
OFFICE 148
IT 128
N
OFFICE 123
3
CPT-01
FE
CORRIDOR 149
M
COATS 122
3
CPT-02
COPY/MAIL 102
OFFICE 121
OFFICE 122
OFFICE 117
OFFICE 116
L
LVT-01
HUDDLE 2 113
HUDDLE 1 114
K
RECEPTION 101
OFFICE 104
OFFICE 120
OFFICE 119
OFFICE 118
OFFICE 115
J
1 TYP.
1 TYP.
CONFERENCE 103
OFFICE 105
OFFICE 112
H
G
OFFICE 106
OFFICE 107
OFFICE 108
OFFICE 109
OFFICE 110
OFFICE 111
F
E
Construction specifications are available for test fit and pricing.
D
C
N
B
18
A Industry Overview
OE Overview
Team & Timeline
Locations
FINISH PLAN 1/4" = 1'-0" Corporate Support A08
KEYNOTES 1/8" = 1'-0" Customer Pr A0
Made with FlippingBook - Online Brochure Maker