Asia Pacific Data Construction Cost Guide 2025
The low, mid and high range categories referenced in the following pages referencethe specifications and key assumptions for base build, fit out and land models below. The low, mid and high-cost ranges are provided as a benchmark across the various categories.
FIT OUT
BASE BUILD
Model Assumption Category
Low Specification
Mid Specification
High Specification
Model Assumption Category
Low Specification
Mid Specification
High Specification
Quality of Construction (Incl. Materials & Supplier Spec.) Design For Maintenance Without Disruption
Quality of Construction (Incl. Materials & Supplier Spec.)
$-$$ Average quality
$$-$$$ Good quality
$$$$ Prestige quality
$-$$ Average quality
$$-$$$ Good quality
$$$$ Prestige quality
Quality vs Performance
A good cost-to performance ratio
A premium dependable facility
A fault-tolerant facility ideal for consistently
No
Yes
Yes
Redundancy & Operational Standard
Tier 2
Tier 3
Tier 3-4
Compartmentalisation
No
Yes
Yes
Single system non-redundant
Multiple redundancy (1 x active + 1 x passive)
Multiple (2 x active) (Zero points of failure)
Cabinets / Cages / Private Suites
Source Paths
Space
Cabinets
Cabinets / Cages
Carrier Neutral
No
Yes
Yes
Services
Low Density
Mid Density
High Density / Private AI
RackPower Density
10-30kW Per rack
10-50 kW Per rack
10-125+ kW Per rack
Floor Loading
Low Capacity
Mid-High Capacity
Mid-High Capacity
Multiple paths, multiple substaions 2 Diverse Paths From 2 Substations 2 Diverse paths from 1-2 mains
Coverage Interconnection (If Applicable)
Cross Connect – Cross Link DC-DC
Cross Connect – Cross Link DC-DC
Power Source
1 path from 1 substation
Multiple paths 1-2 substations
No
2 Diverse paths From 1-2 Substations 2 Diverse paths From 1-2 mains
Power Source Redundancy
1 path From 1 Substation
Water Source Redundancy
1 path from 1 mains
LAND
Model Assumption Category
Low Range
Mid Range
High Range
Generator Redundancy
N-N+2
N+1, block redundant-2N
N+1, block redundant – 2N+1
$-$$ Average quality
$$-$$$ Good quality
$$$$ Prestige quality
Cooling Redundancy
N-N+2
N+2
N+2-2N+1
Land Price Quality
UPS Redundancy
N-N+2
N+1, block redundant-2N
N+1, block redundant – 2N+1
Prime Location, High Demand, Infrastructure Available
Remote, Low Demand, Minimal Infrastructure
Suburban, Moderate Demand, Infrastructure Available
Location
Cooling Technology
Air Cooled
Air Cooled
Liquid Cooling
CUSHMAN & WAKEFIELD | ASIA PACIFIC - DATA CENTRE CONSTRUCTION COST GUIDE 2025