Asia Pacific Data Construction Cost Guide 2025
BANGALORE, CHENNAI, DELHI, HYDERABAD & MUMBAI
BATAM, CENTRAL JAVA, GREATER JAKARTA & WEST JAVA
Cost
Cost
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Development Example Cost Breakdown (% Dev. Cost Scenario A)
Cluster Land / Site Purchase Cost
Unit
Cluster Land / Site Purchase Cost
Unit
Low
Mid
High
Low
Mid
High
Bengaluru Peripheral South
$ / SQM
$945
$1,553
$2,999
Central Batam
$ / SQM
$174
$209
$243
Ambattur
$ / SQM
$503
$857
$1,200
Bekasi
$ / SQM
$174
$205
$237
6%
5% 9%
10%
25%
Gurugram
$ / SQM
$1,518
$2,363
$2,838
31%
10%
Karawang
$ / SQM
$139
$174
$209
10%
Noida
$ / SQM
$514
$696
$1,200
South Hyderabad
$ / SQM
$118
$268
$482
Central Jakarta
$ / SQM
$4,871
$9,393
$13,916
8%
19%
8%
West Hyderabad
$ / SQM
$2,048
$3,151
$3,781
21%
Blended Land Purchase Cost
$ / SQM
$1,339
$2,495
$3,651
7%
Panvel
$ / SQM
$129
$246
$250
6%
9%
10%
1%
Cost
Powai
$ / SQM
$2,520
$3,151
$3,939
1%
Construction Cost
Unit
Low
Mid
High
1% 1%
Thane Belapur Road
$ / SQM
$1,178
$2,035
$3,500
1%
Cost Per Watt
$ Per Watt
$6.49
$9.02
$11.56
Blended Land Purchase Cost
$ / SQM
$936
$1,463
$2,156
1%
Cost Per MegaWatt
$ Per MegaWatt
$6,487,788 $9,024,147 $11,560,506
Cost
Economic Indicators
2022 Rate
2023 Rate 2024 Rate
2025 Rate
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
Professional Fees / Soft Costs Base Building Interior Fit-Out / Finishes Electrical Systems Mechanical Systems Cooling Systems Fire Suspression & Life Safety Systems Security Systems Furniture & Fixtures
Construction Cost
Unit
Low
Mid
High
GDP Growth Inflation Rate
5.30% 4.70% 5.50%
5.10% 2.80% 6.00%
5.00% 1.70% 6.00%
4.70% 3.10% 4.35%
Cost Per Watt
$ Per Watt
$5.63
$7.13
$8.63
Cost Per MegaWatt
$ Per MegaWatt
$5,626,530 $7,126,938 $8,627,346
Central Bank Rate
Economic Indicators
2022 Rate
2023 Rate 2024 Rate
2025 Rate
Construction Cost Year Over Year % Change 5.00% Applied Local FX Rate
GDP Growth Inflation Rate
6.60% 6.40% 6.50%
7.80% 5.50% 6.75%
6.80% 5.80% 6.75%
6.40% 4.10% 5.85%
1 USD = 15392.5 IDR
Central Bank Rate
Construction Cost Year Over Year % Change 5.00% Applied Local FX Rate
1 USD = 83.2175 INR
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
IT Rack, Equip. & Cabling (Excl. Active IT Equip.) Land (Excl. Land Infrastructure Leveling Costs)
Notes: •
CUSHMAN & WAKEFIELD | ASIA PACIFIC - DATA CENTRE CONSTRUCTION COST GUIDE 2025
21
Made with FlippingBook - Online catalogs