Asia Pacific Data Centre Update

H2 22 HKG

CONSTRUCTION & PLANNED UPDATES*

GREATER CHINA

OPERATOR

DATA CENTRE LOCATION

BUILDING SIZE

POWER

STAGE - EST. RFS

HKG1

Tsing Yi Hui

17,400m²

Next phase: 8MW

Planned

Fo Tan DC / STTL 613

Phase 1: 10MW Phase 2: 30MW

U/C - 2025 Planned

Sha Tin

73,300m 2

CONTACTS Click on each name to email them

CITIC Telecom Tower

Kwai Chung

6,800m²

Phase 3: 1.12MW

Planned

JOHN SIU Managing Director, Hong Kong john.siu@cushwake.com ROSANNA TANG Executive Director, Head of Business Development Services, Research, Hong Kong rosanna.tang@cushwake.com

HKG11

Kwai Chung

21,185 m²

Phase 2: 16.5MW

Planned

HK 1 HK 4

Tsuen Wan Sha Tin

7,100m² 4,500m²

Next phase: 0.75MW Next phase: 10.62MW

Planned

HK 1

Kwai Chung

27,300m 2

40MW

Planned

HK 1 HK 2 HK 3 HK 4

HK 1: 22,900m 2 HK 2: 21,200m 2 HK 3: 22,100m 2 HK 4: 25,800m 2

19MW 18MW 21MW 22MW

HK 1, 2 & 4: Kwai Chung HK 3: Tsuen Wan

HK 1: U/C - Q1 2023 HK 2: U/C - Q2 2024 HK 3 & 4: Planned

Phase 1: 50MW Phase 2: 129.5MW

IDC Phase 1: U/C – 2023 IDC Phase 2: Planned - 2026

MEGA IDC

Tseung Kwan O

112,600m 2

12,000m 2 18,800m 2

Phase 2: 5MW 20MW

Fanling: U/C Gateway: U/C - Q4 2022

MEGA Fanling MEGA Gateway

Fanling Tsuen Wan

TGT Hong Kong Data Centre 2

Tseung Kwan O Industrial Estate

22,000m²

Next phase: 3MW

Planned

Phase 1: 12MW Phases 2 - 4: 36MW

U/C - 2023 Planned

HKG5

Tsuen Wan West

65,100m 2

* Excludes Captive & ICT construction updates.