Americas Office Fit Out Cost Guide 2024
OFFICE FIT OUT COST GUIDE 2024
LOCAL MARKET DATA
GUADALAJARA (LC) 2022
GUATEMALA (LC)
2023
2024
2024
Misc. Architectural Trades
Misc. Architectural Trades
121.61
139.85
171.30
36.89
Arch. Millwork
Arch. Millwork
32.67
37.57
54.48
36.07
Doors, Frames, Hdwr
Doors, Frames, Hdwr
57.94
66.63
116.60
44.19
Drywall, Acoustic, Carpentry
Drywall, Acoustic, Carpentry
245.05
281.81
366.35
49.36
General Finishes
General Finishes
149.27
171.67
214.58
59.31
Mechanical, Plumbing, Fire Protection
Mechanical, Plumbing, Fire Protection
245.18
281.96
347.84
157.00
Electrical
Electrical
221.77
255.03
279.69
186.60
General Requirements, General Conditions & Fee
General Requirements, General Conditions & Fee
381.11
438.28
382.19
183.08
Contingency
Contingency
145.46
167.28
217.46
75.14
Total
1,600.07
1,840.08
2,150.50
Total
827.64
HOUSTON
INDIANAPOLIS
2022
2023
2024
2022
2023
2024
Misc. Architectural Trades
Misc. Architectural Trades
$3.01
$3.95
$4.69
$2.86
$3.33
$3.55
Arch. Millwork
Arch. Millwork
$6.75
$5.28
$5.74
$5.23
$5.71
$6.05
Doors, Frames, Hdwr
Doors, Frames, Hdwr
$10.86
$10.73
$10.23
$11.67
$14.77
$11.05
Drywall, Acoustic, Carpentry
Drywall, Acoustic, Carpentry
$12.99
$17.66
$17.12
$16.33
$15.57
$16.51
General Finishes
General Finishes
$8.13
$9.49
$10.43
$7.78
$7.91
$8.92
Mechanical, Plumbing, Fire Protection
Mechanical, Plumbing, Fire Protection
$18.26
$18.63
$18.46
$19.38
$18.23
$16.75
Electrical
Electrical
$25.78
$26.06
$29.06
$19.43
$25.51
$24.38
General Requirements, General Conditions & Fee
General Requirements, General Conditions & Fee
$12.42
$11.02
$11.08
$12.43
$12.83
$13.20
Contingency
Contingency
$9.82
$9.55
$10.76
$9.51
$9.13
$9.75
Total
$108.04
$112.36
$117.58
Total
$104.61
$112.98
$110.16
NOTES: LC=Local Currency All costs are GEN 1 GEN 2 costs have a 10-15% discount