PowerPoint Presentation
PREPARING FOR DAY ONE
Example 3: This smaller office suite lost seating capacity to create a wide two-way circulation path through the open space. In addition, the capacity is reduced as spacing on Day One is managed with checkerboard seating to ensure secondary circulation distances. The elevator lobby and supplemental restroom require coordination by users to avoid conflicts.
RECOVERY READINESS: TRI-STATE
31
Made with FlippingBook Publishing Software