Expected Construction Completions: US Markets 2025-2026
• Of the nearly 16 msf currently under
construction in the U.S., the bulk of it — 14 msf — is due for completion in 2025. This marks a significant slowdown in the life sciences construction pipeline, with less than 2 msf expected to deliver beyond 2025. • The San Francisco Bay Area is expected to add the most space in 2025, with nearly 4 msf expected to deliver. With 85% of this space currently available, a large portion will likely deliver vacant in 2025, putting further pressure on the Bay Area’s vacancy rate. • The Boston market, which has seen the highest volume of vacant new space delivered, has slowed its construction pipeline. Of the 3 msf slated for delivery this year, only 51% remains available — a figure that may drop as more tenants commit to new space.
Pre-leased
Available
100%
0.1
90%
80%
0.4
2.1
2.0
70%
60%
3.2
0.3
50%
0.5
0.2
1.7
40%
Percent Available and Pre-leased (Under Construction in MSF)
30%
0.4
1.9
1.4
20%
10%
0.5
0.04
0%
Boston
SF Bay Area San Diego Philadelphia
Seattle
New Jersey
Chicago
Denver