Life Sciences U.S. Fit-Out Cost Guide 2025
SINGLE-USE HOUSING VIVARIUM
WAREHOUSE SPACE
WAREHOUSE SPACE Typical Activities >
SINGLE-USE HOUSING VIVARIUM Typical Activities > Small animal simulated environmental R&D Typical Activities > Small animal simulated environmental R&D Typical Equipment > Holding cages > Freezers and fridges > Centrifuges Basic Construction Elements 100% OSA HVAC system on standby power > Holding cages on separate air distribution and automated water systems > Seamless floors > Small power use and distribution > Standby power > Aux cleaning areas for holding cages and bedding staging areas > Necropsy spaces > Special lighting requirements day and red-light controls > Casework Typical Equipment > Holding cages > Freezers and fridges > Centrifuges Basic Construction Elements > 100% OSA HVAC system on standby power > Holding cages on separate air distribution and automated water systems > Seamless floors > Small power use and distribution > Standby power > Aux cleaning areas for holding cages and bedding staging areas > Necropsy spaces > Special lighting requirements day and red-light controls > Casework
mbient and cold bulk material storage
Typical Activities > Ambient and cold bulk material storage Typical Equipment > Loading/receiving dock > High bay warehouse racking (assume four-level elevated shelving) > Utility/mechanical area > AHUs, chillers, boilers, condensers, pumps > Electrical room > IT room > Cold storage and -20-degree cold room > Condenser > Electrical panels > Control panels Equipm nt Load ng/receiving dock > High bay warehouse racking (assume four-level elevat d shelving) > Utility/mechanical area > AHUs, chillers, boilers, condensers, pumps > Electrical room > IT room > Cold storage and -20-degree cold room > Condenser > Electrical panels > Control panels Basic Construction Elements Dehumidification control > Sealed concrete flooring > In-rack ambient sprinkler system > Dry sprinkler system (cold room) > Single story, 30-foot joist clearance Basic Construction Elements > Dehumidification control > Sealed concrete flooring > In-rack ambient sprinkler system > Dry sprinkler system (cold room) > Single story, 30-foot joist clearance
20
Cushman & Wakefield
Made with FlippingBook Digital Proposal Maker