Americas Office Fit Out Cost Guide 2023
OFFICE FIT OUT COST GUIDE 2023
LOCALMARKETDATA
ST. LOUIS
TAMPA
2022
2023
2022
2023
$2.84
$5.31
$3.04
$2.85
Misc. Architectural Trades
Misc. Architectural Trades
$6.87
$6.90
$4.88
$5.38
Arch. Millwork
Arch. Millwork
$10.77
$9.76
$11.39
$15.81
Doors, Frames, Hdwr
Doors, Frames, Hdwr
$12.69
$13.94
$15.49
$10.53
Drywall, Acoustic, Carpentry
Drywall, Acoustic, Carpentry
$6.52
$7.51
$7.89
$8.90
General Finishes
General Finishes
Mechanical, Plumbing, Fire Protection
Mechanical, Plumbing, Fire Protection
$17.14
$18.71
$20.79
$22.35
$21.24
$20.69
$24.74
$32.02
Electrical
Electrical
General Requirements, General Conditions & Fee
General Requirements, General Conditions & Fee
$7.95
$10.64
$13.11
$16.03
$8.60
$8.71
$10.13
$9.87
Contingency
Contingency
$94.62
$102.19
$111.47
$123.73
Total
Total
TORONTO (LC)
UPSTATE NY
2022
2023
2022
2023
3.46
6.04
$4.33
$4.76
Misc. Architectural Trades
Misc. Architectural Trades
11.71
13.57
$6.82
$7.50
Arch. Millwork
Arch. Millwork
18.80
24.19
$12.56
$13.82
Doors, Frames, Hdwr
Doors, Frames, Hdwr
26.20
25.84
$20.83
$22.92
Drywall, Acoustic, Carpentry
Drywall, Acoustic, Carpentry
9.99
11.77
$9.58
$10.54
General Finishes
General Finishes
Mechanical, Plumbing, Fire Protection
Mechanical, Plumbing, Fire Protection
29.03
28.49
$25.07
$27.58
37.96
41.73
$32.50
$35.75
Electrical
Electrical
General Requirements, General Conditions & Fee
General Requirements, General Conditions & Fee
28.58
33.29
$13.96
$15.36
16.57
15.61
$12.39
$13.63
Contingency
Contingency
182.31
200.54
$138.05
$151.86
Total
Total
NOTES: LC=Local Currency All costs are GEN 1 GEN 2 costs have a 10-15% discount
41