Americas Office Fit Out Cost Guide 2023
OFFICE FIT OUT COST GUIDE 2023
LOCALMARKETDATA
COSTA RICA (LC)
DALLAS
2022
2023
2022
2023
2,302.46
2,647.83
$3.44
$6.38
Misc. Architectural Trades
Misc. Architectural Trades
3,868.24
4,448.48
$4.01
$5.12
Arch. Millwork
Arch. Millwork
4,295.52
4,939.84
$9.76
$10.56
Doors, Frames, Hdwr
Doors, Frames, Hdwr
7,098.12
8,162.84
$14.68
$18.84
Drywall, Acoustic, Carpentry
Drywall, Acoustic, Carpentry
6,165.13
7,089.90
$9.00
$8.59
General Finishes
General Finishes
Mechanical, Plumbing, Fire Protection
Mechanical, Plumbing, Fire Protection
9,527.44
10,956.55
$23.24
$26.96
13,286.98
15,280.02
$30.57
$31.40
Electrical
Electrical
General Requirements, General Conditions & Fee
General Requirements, General Conditions & Fee
15,815.40
18,187.71
$21.69
$15.19
4,697.31
5,401.91
$11.32
$12.93
Contingency
Contingency
67,056.59
77,115.08
$127.71
$135.97
Total
Total
DENVER
DETROIT
2022
2023
2022
2023
$3.04
$2.56
$2.79
$1.77
Misc. Architectural Trades
Misc. Architectural Trades
$5.75
$5.90
$4.98
$1.63
Arch. Millwork
Arch. Millwork
$11.79
$13.95
$12.21
$10.19
Doors, Frames, Hdwr
Doors, Frames, Hdwr
$10.03
$14.45
$14.73
$22.52
Drywall, Acoustic, Carpentry
Drywall, Acoustic, Carpentry
$11.81
$9.44
$8.44
$8.65
General Finishes
General Finishes
Mechanical, Plumbing, Fire Protection
Mechanical, Plumbing, Fire Protection
$24.25
$24.84
$19.26
$22.62
$27.56
$38.17
$21.40
$30.04
Electrical
Electrical
General Requirements, General Conditions & Fee
General Requirements, General Conditions & Fee
$12.66
$16.07
$10.82
$14.64
$10.69
$11.04
$9.46
$9.74
Contingency
Contingency
$117.59
$136.41
$104.09
$121.80
Total
Total
NOTES: LC=Local Currency All costs are GEN 1 GEN 2 costs have a 10-15% discount