Americas Fit-Out Cost Guide 2022

LOCALMARKETDATA

ARGENTINA

ATLANTA

Local currency

1st Generation

1st Generation

$14.54

862.27

$3.62

Misc. Architectural Trades

Misc. Architectural Trades

$14.55

862.72

$5.52

Arch. Millwork

Arch. Millwork

$10.22

606.15

$10.81

Doors, Frames, Hdwr

Doors, Frames, Hdwr

$11.62

688.73

$15.26

Drywall, Acoustic, Carpentry

Drywall, Acoustic, Carpentry

$13.60

806.47

$6.97

General Finishes

General Finishes

Mechanical, Plumbing, Fire Protection

Mechanical, Plumbing, Fire Protection

$15.49

918.07

$21.78

$24.05

1,425.90

$22.34

Electrical

Electrical

General Requirements, General Conditions & Fee

General Requirements, General Conditions & Fee

$1.58

93.47

$8.89

$10.57

626.38

$9.52

Contingency

Contingency

$116.22

6,890.18

$104.71

Total

Total

AUSTIN

BALTIMORE

1st Generation

1st Generation

$3.00

$2.67

Misc. Architectural Trades

Misc. Architectural Trades

$6.95

$6.00

Arch. Millwork

Arch. Millwork

$11.37

$14.36

Doors, Frames, Hdwr

Doors, Frames, Hdwr

$12.51

$15.15

Drywall, Acoustic, Carpentry

Drywall, Acoustic, Carpentry

$10.75

$7.64

General Finishes

General Finishes

Mechanical, Plumbing, Fire Protection

Mechanical, Plumbing, Fire Protection

$19.83

$26.38

$27.26

$29.26

Electrical

Electrical

General Requirements, General Conditions & Fee

General Requirements, General Conditions & Fee

$13.68

$15.71

$10.54

$13.18

Contingency

Contingency

$115.89

$130.35

Total

Total

NOTES: 1. Generation 1 costs

2. Generation 2 costs have a 10-15% discount 3. All costs in USD unless otherwise noted

20

AMERICAS OFFICE FIT-OUT COST GUIDE 2022