2025 Industrial Construction Cost Guide
Local Market DataU.S.
GREENVILLE
2024 2025 SMALL MEDIUM LARGE SMALL MEDIUM LARGE
Site Work
$21.86
$11.94 $30.81 $15.43 $6.31 $5.80 $6.36 $76.65
$10.88 $26.21 $14.55 $5.37 $4.80 $5.52 $67.32
$21.79 $44.18 $22.36 $9.05 $10.29 $10.29 $117.97
$18.74 $25.46 $5.55 $5.21 $5.81 $5.84 $66.61
$15.18 $21.59 $5.49 $4.42 $4.86 $4.93 $56.46
Base Bldg Structural & Enclosure $39.85
Base Bldg Architectural
$46.77 $8.16 $11.54 $11.00 $139.20
Base Bldg MEP
GC’s and GR’s & Fee
Contingency
Total Cost
HOUSTON
2024 2025 SMALL MEDIUM LARGE SMALL MEDIUM LARGE
Site Work
$16.55
$13.05 $13.73 $43.36 $2.00 $4.35 $7.33 $83.81
$11.79 $12.95 $43.41 $1.88 $3.78 $7.08 $80.90
$17.38 $16.63 $61.15 $2.42 $7.39 $10.06 $115.04
$13.74 $14.39 $41.31 $2.09 $4.33
$11.89 $13.59 $39.14 $1.98 $3.72 $6.74 $77.05
Base Bldg Structural & Enclosure $15.84
Base Bldg Architectural
$63.98 $2.30 $8.69 $10.25 $117.62
Base Bldg MEP
GC’s and GR’s & Fee
Contingency
$7.27
Total Cost
$83.12
INDIANAPOLIS
2024 2025 SMALL MEDIUM LARGE SMALL MEDIUM LARGE
Site Work
$23.84
$12.74 $31.33 $12.27 $8.28 $5.77 $6.76 $77.16
$11.25
$26.85 $51.35 $27.37 $13.57 $11.78 $12.55 $143.46
$24.57 $31.40 $7.33 $8.30 $4.91 $7.35 $83.86
$21.53 $28.95 $7.79 $7.65 $3.88 $6.66 $76.46
Base Bldg Structural & Enclosure $41.41
$25.83 $10.76 $6.82 $4.63 $5.70 $64.99
Base Bldg Architectural
$36.45 $10.94 $11.67 $11.99 $136.29
Base Bldg MEP
GC’s and GR’s & Fee
Contingency
Total Cost
INLAND EMPIRE
2024 2025 SMALL MEDIUM LARGE SMALL MEDIUM LARGE
Site Work
$45.85
$22.63 $15.87 $35.15 $3.02 $5.27 $7.85 $89.80
$20.28 $13.98 $33.86
$45.10 $45.02 $24.31 $8.58 $21.37 $13.61 $158.00
$22.32 $35.23 $6.20 $6.71 $12.85
$19.09 $31.24 $6.54 $5.95 $9.99 $6.77 $79.59
Base Bldg Structural & Enclosure $31.34
Base Bldg Architectural
$42.45 $5.97 $10.77 $13.00 $149.39
Base Bldg MEP
$2.66 $4.65
GC’s and GR’s & Fee
Contingency
$7.21
$7.63
Total Cost
$82.66
$90.94
2025 Industrial Construction Cost Guide 29